When selecting household products for
Ev Charging Station, one should not only compare prices, but also comprehensively screen from multiple dimensions such as safety standards, protection levels, protection, intelligence, and after-sales capabilities. Firstly, confirm that the product complies with the latest national standards GB39752 and GB44263, and verify the product testing report.
Priority is given to protection level IP54 or above, which can prevent dust and splash, and is suitable for outdoor parking installation. Core electrical protection is essential, including overvoltage, undervoltage, overload, leakage, lightning protection, overheating protection, and automatic power-off in case of faults.
The mainstream choice for home use is a 7kW AC power station, which comes with Bluetooth and WiFi modules, supports checking battery level through a mobile app, remote start stop, and scheduling valley power charging. Distinguish between wall mounted and column mounted: prioritize wall mounted piles for underground garages.
Outdoor parking spaces without walls should be designed with columns. Choose national standard pure copper cables for cables, match the wire diameter according to the distance, and upgrade the cable specifications when the line is long to reduce voltage drop and heat generation. Try to choose branded and legitimate products, and refuse low-priced miscellaneous brand piles. Miscellaneous brands lack complete protection and are prone to electrical leakage and fire hazards.
At the same time, pay attention to local after-sales service.
Flexible Charging Stack are electrical equipment, and later troubleshooting requires nearby service providers. Also, it is necessary to confirm whether the product supports vehicle protocol adaptation and verify the vehicle model before placing an order.
It is not recommended to blindly purchase 22kW household piles. Only when the vehicle's on-board charger supports 22kW can it be fully utilized, otherwise the funds will be wasted. Before installation, have the service provider conduct an on-site survey of the distribution capacity to avoid insufficient load on the incoming lines.